Dadoji Konddev Stadium

“aURa Engineers” Scope of Work – Construction of 120.62MLD Sewerage Pumping Station at Dadoji Konddev Stadium-Thane, on Labour Rate

120.62MLD SPS (Open Excavation), Thane for Ramky Infrastructure Ltd.:

Construction as per approved GAD and RCC Structural Design of Following Units:-
1. - 1 Nos. RCC Inlet Chamber – 10.08sqm Area X 4.71M SWD
2. - 3 Nos. RCC Coarse Screen Channel – 5.0M L X 1.4M W X 0.9M SWD
3. - 1 Nos. RCC Manual Coarse Screen Channel for Bypass – 4.0M L X 1.2M W X 1.2M SWD
4. - 1 Nos. RCC Raw Sewage Wet Well – 13.0M Dia. X 3.5M SWD
5. - 1 Nos. RCC/ BM Pump House with MCC Room – Semi Circular 13.0M Dia. X 4.5M Height.
6. - 1 Nos. RCC/ BM DG Room – 10.0M L X 6.0M W X 4.0M Height

Cadbury Compound

“aURa Engineers” Scope of Work – Construction of 66.71MLD Sewerage Pumping Station by Well Sinking Method at Cadbury Compound-Thane, on Labour Rate

66.71MLD SPS (Well Sinking), Thane for Ramky Infrastructure Ltd. :

Construction as per approved GAD and RCC Structural Design of Following Units:-
1 - 1 Nos. RCC Inlet Chamber – 5.1M L X 5.1M W X 0.9M SWD
2 - 2 Nos. RCC Coarse Screen Channel – 9.0M L X 1.5M W X 1.2M SWD
3 - 1 Nos. RCC Manual Coarse Screen Channel for Bypass – 5.1M L X 0.7M W X 1.2M SWD
4 - 1 Nos. RCC Raw Sewage Wet Well – 10.1M Dia. X 2.95 SWD
5 - 1 Nos. RCC/ BM Pump House with MCC Room – 10.1M Dia. X 4.5M Height.
6 - 1 Nos. RCC/ BM DG Room – 5.0M L X 5.0M W X 4.0M Height

Ramky Infrastructure

“aURa Engineers” Scope of Work - Installation Testing and Commissioning of Complete Mechanical Equipment-Thane, on Labor Rate

120 MLD Sewerage Treatment Plant, Thane for Ramky Infrastructure Ltd.:

Installation Testing and Commissioning of Complete Mechanical Equipment and Piping as per Approved GADs and Piping Layouts for Following Units:-
1 - 3 Nos. Manual Operated Open Channel Sluice Gates at Inlet Chamber
2 - 2 Nos. Fine Mechanical and 1 Nos. Manual Screen at Screen Channels
3 - 3 Nos. Manual Operated Open Channel Sluice Gates at D/S Screen Channels
4 - 3 Nos. Manual Operated Open Channel Sluice Gates at U/S Grit Chamber
5 - 2 Nos. Mechanical and 1 Manual Grit Mechanism at Grit Chamber
6 - 3 Nos. Manual Operated Open Channel Sluice Gates at D/S Grit Chamber
7 - 6 Nos. Motorized Operated Open Channel Sluice Gates Division and Distribution Box
8 - 6 Lots. S.S. 304 Diffusers at Selector/ Anoxic Zone Reactors
9 - 6 Lots. Internal Piping Diffuser Grids and Diffusers at Aeration Tanks
10 - 6 Lots. Decanters, RAS and SAS Pumps with Ductile Iron Piping at Aeration Tanks
11 - 15 Nos. Aeration Blowers with complete Piping, Valves and Fittings at Blower Room
12 - 6 Sets of Feed pumps, Centrifuge Decanters, Chemical Dosing Skid at Centrifuge Unit
13 - 2 Sets of Chlorination System
14 - 4 Nos. EOTs (Electrically Operated Trolley/ Overhead Cranes)
15 - Interconnecting Piping - D.I., M.S., S.S. Pipes with complete Valves and Fittings

Ramky Infrastructure

7 Nos. Sewerage Pumping Stations, Thane for Ramky Infrastructure Ltd.

Installation Testing and Commissioning of Complete Mechanical Equipment and Piping for Following Units

Motorized Operated Thimble/ Wall mounted Gates at U/S Screen Channels
1 - J Type Screens at Screen Channels
2 - Coarse Mechanical and Manual Screens at Screen Channels
3 - EOT (Electrically Operated Trolley/ Overhead Cranes) at Screen Channels
4 - Motorized Operated Thimble/ Wall mounted Gates at D/S Screen Channels
5 - Raw Sewage Pumps at Raw Sewage Pump House
6 - EOT (Electrically Operated Trolley/ Overhead Cranes) at Raw Sewage Pump House
7 - Interconnecting Piping – D.I. K7 Double Flanged Pipes with complete Valves and Fittings

120MLD STP -Thane

“aURa Engineers” Scope of Work – Lowering Laying and Jointing of Rising Main from Various Sewerage Pumping Stations to 120MLD STP -Thane, on Labor Rate

LLJ of Rising Main, Thane for Ramky Infrastructure Pvt. Ltd

1 - Lowering Laying and Jointing of Rising Main from Various Sewerage Pumping Stations to 120MLD STP as per Approved L-Sections:-
2 - LLJ of 1470 Rmtrs of 1100mm Dia. GRP Pipeline from PS-8 to 120MLD STP
3 - LLJ of 1300 Rmtrs of 800mm Dia. D.I. K7 Pipeline from PS-7 to PS-8 UGD Chamber
4 - LLJ of 2250 Rmtrs of 1000mm Dia. D.I. K7 Pipeline from Da PS-5 to 120MLD STP

Salolim-South Goa

“aURa Engineers” Scope of Work – Construction of Intake Well by Well Sinking Method for Expansion of 100MLD WTP, Salolim-South Goa, with Material

Intake Well (Well Sinking Method) for 100MLD WTP Expansion-South Goa for SMC-SPML JV

Construction as per approved GAD and RCC Structural Design of:-
1 Nos. RCC Intake Well – 20.0M Dia. X 30M HT

Pumping Station-Aurangabad

“aURa Engineers” Scope of Work – Construction of 211.0MLD Sewerage Pumping Station-Aurangabad, on Labour Rate

211.0MLD SPS (Open Excavation), Aurangabad for KIPL-GECPL JV.:
Construction as per approved GAD and RCC Structural Design of Following Units:-

1 - 1 Nos. RCC Inlet Chamber – 72.85sqm Area X 2.00M SWD
2 - 6 Nos. RCC Coarse Screen Channel – 8.0M L X 1.6M W X 1.2M SWD
3 - 1 Nos. RCC Raw Sewage Wet Well – 26.5M Dia. X 3.0M SWD
4 - 1 Nos. RCC/ BM Pump House with MCC Room – Semi Circular 26.5M Dia. X 4.5M Height.

Mechanical Equipment-Aurangabad

“aURa Engineers” Scope of Work - Installation Testing and Commissioning of Complete Mechanical Equipment-Aurangabad, on Labor Rate

01. 161 MLD Sewerage Treatment Plant, Aurangabad for KIPL-GECPL JV.:

Installation Testing and Commissioning of Complete Mechanical Equipment and Piping as per Approved GADs and Piping Layouts for Following Units:-
1. - 6 Nos. Manual Operated Open Channel Sluice Gates at Stilling Chamber
2. - 5 Nos. Fine Mechanical and 1 Nos. Manual Screens at Screen Channels
3. - 6 Nos. Manual Operated Open Channel Sluice Gates at D/S Screen Channels
4. - 5 Nos. Manual Operated Open Channel Sluice Gates at U/S Grit Chamber
5. - 4 Nos. Mechanical Grit Mechanism at Grit Chamber
6. - 5 Nos. Manual Operated Open Channel Sluice Gates at D/S Grit Chamber
7. - 8 Nos. Motorized Operated Open Channel Sluice Gates at Splitter/ Distribution Box
8. - 8 Lots S.S. 304 Diffusers at Selector/ Anoxic Zone Reactors
9. - 8 Lots Internal Piping Diffuser Grids and Diffusers at Aeration Tanks
10. - 8 Nos. Decanters, RAS and SAS Pumps with Ductile Iron Piping at Aeration Tanks
11. - 10 Nos. Aeration Turbo Blowers with complete Piping, Valves and Fittings at Blower Room
12. - 5 Nos. Feed pumps, Centrifuge Decanters, Chemical Dosing Skid at Centrifuge Building
13. - 2 Sets of Chlorination System
14. - EOTs (Electrically Operated Trolley/ Overhead Cranes)
15. - Interconnecting Piping - D.I., M.S., S.S. Pipes with complete Valves and Fittings

02. 211MLD Sewerage Pumping Stations, Aurangabad for KIPL-GECPL JV.:

Installation Testing and Commissioning of Complete Mechanical Equipment and Piping for Following Units:-
1. - 6 Nos. Manual Operated Wall mounted Gates at U/S Screen Channels
2. - 5 Nos. Coarse Mechanical and 1 Nos. Manual Screens at Screen Channels
3. - 10 Nos. 1470m3/hr @ 38 Mtr head Raw Sewage Pumps at Raw Sewage Pump House
4. - 3 Ton EOT (Electrically Operated Trolley/ Overhead Cranes) at Raw Sewage Pump House
5. - Interconnecting Piping – D.I. K9 Double Flanged Pipes with complete Valves and Fittings

03. 10MLD Sewerage Pumping Stations, Aurangabad for KIPL-GECPL JV.:

Installation Testing and Commissioning of Complete Mechanical Equipment and Piping for Following Units:-
6. - 3 Nos. Manual Operated Wall mounted Gates at U/S Screen Channels
7. - 2 Nos. Coarse Mechanical and 1 Nos. Manual Screens at Screen Channels
8. - 3 Nos. 266m3/hr @ 27 Mtr head Raw Sewage Pumps at Raw Sewage Pump House
9. - 2 Ton EOT (Electrically Operated Trolley/ Overhead Cranes) at Raw Sewage Pump House
10. - Interconnecting Piping – D.I. K9 Double Flanged Pipes with complete Valves and Fittings

Sewerage Pumping Stations, Aurangabad

“aURa Engineers” Scope of Work – Lowering Laying and Jointing of Rising Main from 211MLD & 10MLD Sewerage Pumping Stations to 161MLD STP -Aurangabad, on Labor Rate

LLJ of Rising Main, Aurangabad for KIPL-GECPL JV:

1 - Lowering Laying and Jointing of Rising Main from 161MLD & 10MLD Sewerage Pumping Stations to 161MLD STP as per Approved L-Sections:-
2 - 9682 Sqm Gannating and Internal Cement Mortar Lining (with Material) of 1626mm Dia MS Pipe
3 - LLJ of 1900 Rmtrs of 1626mm Dia. M.S. Pipeline from 211MLD SPS to 161MLD STP
4 - LLJ of 1600 Rmtrs of 450mm Dia. D.I. K9 Pipeline from 10MLD SPS to 161MLD STP

Mechanical Equipment-Thane

“aURa Engineers” Scope of Work – Dismantling, Maintenance & Overhauling, Re-Installation Testing and Commissioning of Mechanical Equipment-Thane, on Labor Rate

5 Yearly Maintenance & Overhauling of 120 MLD Sewerage Treatment Plant, Thane for Ramky Infrastructure Ltd.:

1 - Servicing of 3 Nos. Manual Operated Open Channel Sluice Gates at Inlet Chamber
2. - Major Maintenance & Overhauling of 2 Nos. Fine Mechanical Screen at Screen Channels
3. - Servicing of 3 Nos. Manual Operated Open Channel Sluice Gates at D/S Screen Channels
4. - Servicing of 3 Nos. Manual Operated Open Channel Sluice Gates at U/S Grit Chamber
5. - Major Maintenance & Overhauling of 2 Nos. Mechanical Grit Mechanism at Grit Chamber
6. - Servicing of 3 Nos. Manual Operated Open Channel Sluice Gates at D/S Grit Chamber
7. - Servicing of 6 Nos. Motorized Operated Open Channel Sluice Gates at Distribution Box
8. - Major Maintenance & Overhauling of 1 Set and Servicing of 5 Sets of Feed pump at Centrifuge Unit
9. - Major Maintenance & Overhauling of 1 Sets of Chemical Dosing Skid at Centrifuge Unit
10. - Major Maintenance & Overhauling of 6 Sets of Centrifuge Decanters at Centrifuge Unit
11. - Major Maintenance & Overhauling 4 Nos. EOTs (Electrically Operated Trolley)

5 Yearly Maintenance & Overhauling of 3 Nos. Sewerage Pumping Stations (PS-3, PS-5 & PS-6), Thane for Ramky Infrastructure Ltd.:

1. - Major Maintenance & Overhauling of Motorized Operated Thimble mounted Gates at U/S Screen Channels
2. - Major Maintenance & Overhauling of Coarse Mechanical Screens at Screen Channels
3. - Major Maintenance & Overhauling of Motorized Operated Thimble mounted Gates at D/S Screen Channels
4. - Major Maintenance & Overhauling of EOT (Electrically Operated Trolley/ Overhead Cranes) at Raw Sewage Pump House