“aURa Engineers” Scope of Work – Construction of 120.62MLD Sewerage Pumping Station at Dadoji Konddev Stadium-Thane, on Labour Rate
120.62MLD SPS (Open Excavation), Thane for Ramky Infrastructure Ltd.:
Construction as per approved GAD and RCC Structural Design of Following Units:-
1. - 1 Nos. RCC Inlet Chamber – 10.08sqm Area X 4.71M SWD
2. - 3 Nos. RCC Coarse Screen Channel – 5.0M L X 1.4M W X 0.9M SWD
3. - 1 Nos. RCC Manual Coarse Screen Channel for Bypass – 4.0M L X 1.2M W X 1.2M SWD
4. - 1 Nos. RCC Raw Sewage Wet Well – 13.0M Dia. X 3.5M SWD
5. - 1 Nos. RCC/ BM Pump House with MCC Room – Semi Circular 13.0M Dia. X 4.5M Height.
6. - 1 Nos. RCC/ BM DG Room – 10.0M L X 6.0M W X 4.0M Height